Protect Your Asphalt the Devine Way ā Automatically, Every Year
Discover Devine Protection
4.8
(101)
Professional Crack Filling & Patch Repair
Stop small damage from becoming big problemsāextend the life of your asphalt with expert repairs that last
Commercial Asphalt Maintenance & Repairs
Our Rubberized Hot Tar Crack Filling Process
Thorough Inspection & Assessment
We evaluate your pavement to identify all cracks (1/4" or wider), potholes, and weak areas, recommending the best repair method for each
Surface Cleaning & Preparation
Utilizing power blowers and wire brushes, cracks are cleaned of debris, vegetation, and loose material
Premium Material Application
Hot pour rubberized sealant is applied to cracks measuring 1/4" or wider, as determined by the contractor's discretionāsealant provides a flexible waterproof seal
Leveling & Smoothing
Rubberized hot tar is leveled flush with surrounding pavement to create a seamless, drivable surface
Final Sealing (Optional Add-On)
For best results, we can apply a top coat of sealer over repaired areas to blend and protect the entire surface
Cleanup & Quality Check
We remove all debris and perform a final walkthrough to ensure repairs meet our high standardsāyour asphalt is ready for immediate use
Our Asphalt Patch Repair Process
Thorough Inspection & Assessment
We evaluate your pavement to identify all cracks, potholes, and weak areas, recommending the best repair method for each
Surface Cleaning & Preparation
Potholes are cut to clean, square edges using a cutoff saw, removing damaged areaātop layer of asphalt is removed, and area is swept clean of dust and debris for maximum adhesionāØ
Premium Material Application
All potholes are filled with commercial-grade asphalt patch and compacted for strengthāØ
Leveling & Smoothing
āØRepairs are leveled flush with surrounding pavement to create a seamless, drivable surface without bumps or dipsāØ
Final Sealing
For best results, we can apply a top coat of sealer over repaired areas to blend and protect the entire surface (*Optional Add-On)
Cleanup & Quality Check
All debris is removed from the site, and a final walkthrough is performed to ensure repairs meet our high standards
Curing Time
Repaired areas should be avoided for a minimum of 10 days to allow proper curing